MSHA
solutions for JRJ location in Ohio
The addition of sight rails on the existing
B-TEK scale, ensures the facility’s
compliance with MSHA’s sight rail requirement
with minimized scale downtime. Pre-existing
battered and bruised pipe was heated, cut,
pulled, pushed and patched prior to putting the extensions on top in an effort to make the
new pipe as straight and level as possible.
After welding all extension pipes to the preexisting,
we touched up new pipe and painted all
existing pipe and brackets for aesthetic appeal. |

|
|
More Information:

|
|
| Related Products: |
|
|